Rackmount VA 6000 User's Guide Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
INSTALLATION
Eaton 5125 Rack-Mount UPS (5000/6000 VA) User's Guide S 164201541 Rev D
www.eaton.com/powerquality
21
Installing the Rail Kit
The rail kit can be mounted in 48-cm (19‐inch) panel racks from 61 to
76 cm (24 to 30 inches) deep and includes:
S Left and right adjustable rail assemblies
S Two rear hold-down brackets
S Two mounting brackets
S Four U-shaped #10-32 clip nuts
S Twelve hex-head screws
S Four #6-32 3/8 flat-head screws
NOTE Mounting rails are required for each individual cabinet.
NOTE If placed in a rack with existing equipment, the rack must be reconfigured to install
the heaviest item in the bottom of the rack. See page 62 for UPS and EBM weights.
To install the rail kit:
1. Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 2).
Rear
Front
Rail Assembly
Assembly Wing Nuts
Figure 2. Adjusting the Rail Depth
2. Select the proper holes in the rail for positioning the UPS and any
optional cabinets in the rack (see Figure 3).
The first rail should be placed at the bottom, using positions 1 and 6
for the front rail hex-head screws. If you are installing additional
rails, the next rail should be placed 4 holes above the last installed
screw.
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 79 80

Comments to this Manuals

No comments